Construction/Production - How Fleet of the Future Cars are Made
BART's Fleet of the Future cars are built
Sahagún, Mexico
Car shell (carbody) assembly, alongside installation of intercar barriers, intercar doors, doors, parts of the interior and electrical harnesses takes place in Mexico.
Car shell (carbody) assembly, alongside installation of intercar barriers, intercar doors, doors, parts of the interior and electrical harnesses takes place in Mexico.
Trucking from Mexico to New York or Califronia
From there, cars are trucked to Plattsburgh, NY or Pittsburg, CA for final assembly.
American truckers pick up the cars at Laredo, Texas.
During this step, you can tell if the car was assembled in Pittsburg, CA or New York. Cars going to the Bay Area with wheels and trucks were assembled in New York.
Cars without wheels and trucks will be assembled in Pittsburg, CA.
American truckers pick up the cars at Laredo, Texas.
During this step, you can tell if the car was assembled in Pittsburg, CA or New York. Cars going to the Bay Area with wheels and trucks were assembled in New York.
Cars without wheels and trucks will be assembled in Pittsburg, CA.
Plattsburgh, NY or Pittsburg, CA
Final assembly of the car, including installation of undercar equipment (trucks, HVAC system, traction control, etc) occurs in one of two plants. From there, the car is trucked over to BART.
From the looks of it, New York is able to build more cars than California (as of June 2023).
Final assembly of the car, including installation of undercar equipment (trucks, HVAC system, traction control, etc) occurs in one of two plants. From there, the car is trucked over to BART.
From the looks of it, New York is able to build more cars than California (as of June 2023).
Delivery to BART Hayward Test Track
Special trailers carry BART cars across the country (or from Pittsburg) to the Hayward Test Track.
Special trailers carry BART cars across the country (or from Pittsburg) to the Hayward Test Track.
BART Acceptance Testing
At the Hayward Test Track, located next to Hayward Yard, cars are tested in a captive environment.
Additionally, the cars are tested on the mainline before entering revenue service.
At the Hayward Test Track, located next to Hayward Yard, cars are tested in a captive environment.
Additionally, the cars are tested on the mainline before entering revenue service.
Revenue Service
Following testing, they enter revenue service carrying thousands of passengers week to week.